Assistant Manager
ASIA - All other Asia
Specialties
Assistant Manager
Director
Project Engineer

Summary

More

Career

Lahore Electric Supply Company Ltd. - Assistant Manager
Government, Defence, Public Services - Government and Defence
Pakistan
Specialties
Assistant Manager
Responsibilities
  •  To ensure uninterrupted supply of electricity to consumers and clearing any fault occurring on HT/LT lines in minimum duration of time.  Patrolling of the 11 KV feeders along with line staff to check condition of various equipments installed on the lines such as structures, insulators, conductors, cross arms, transformers and sag of conductors.  To rectify defects / discrepancies pointed out during the patrolling of feeders on emergent basis to avoid tripping and breakdown of electricity supply.  Ensuring load management by preparing /executing LT proposals for increasing transformer capacity and lying of conductors.  To ensure proper load balancing on all the phases of distribution transformers to avoid damage caused by overloading of transformer.  To earth the Transformer, Poles and structures to avoid any fatal accidents. In addition, during working on the line, ensuring the line is properly earthed on both sides for safety of the line man.  To give training to the line staff of using tools and plants (T&P) such as pliers, screw drivers etc. Moreover, they are also trained to use proper PPE (Personnel protective equipments) such as protective gloves, rubber gloves, safety belt, rubber shoes, and safety cap for their own safety while working on lines.  To eliminate/ reduce line losses by adopting measures such as controlling electricity theft, proper conductor sizing and capacitor installation.
Parks and Horticulture Authority, Lahore - Assistant director
Government, Defence, Public Services - Government and Defence
Pakistan
Specialties
Director
Responsibilities
  •  Preparation of cost estimates for the projects related to installation of LED lights, solar panels and motors as well as for the repair/upkeep of the existing illumination systems.  Calculating the capacity of the submersible and vertical line motors keeping in view the requirements of irrigation system at different sites.  Preparation of the site plans and layout plans showing the routes of underground cables, locations of flood light poles and motors.  Supervision and Monitoring of the ongoing projects regarding solar powered LED lights, LED lights powered through conventional sources of energy and installation of submersible & vertical line motors for their completion within the stipulated period and submission of the progress reports to the seniors on regular basis.  Verification of quality and quantity of ongoing works by performing the relevant checks on the field as well as checking through laboratory tests.  Arrangement for the repair/maintenance of already executed illumination works and installed motors for irrigation purposes and operation of the fountains.  Installation/provision of electricity connections along with transformers of various capacities as per the required load of the lights and motors through Lahore electric supply company (LESCO).  To arrange meetings with LESCO for Reconciliation of issues regarding electricity dues such as erroneous billing on behalf of department.
More
Tetra Pak - project engineer, Trainee Engineer
Pakistan
Specialties
Project Engineer
Responsibilities
  • Getting comprehensive hands-on operational training in all the sections and processes involved in factory i.e. Pre-Press section, press section, laminator, finishing and straw section. ;
  • Worked as project engineer in the capacity enhancement project of the straw making section where the main responsibilities were installation and commissioning of straw making machines as well as placing orders of various spare parts. ;
  • Selecting the size and length of electric cables as per the load of the machines as well as cable laying for connecting the machines with the power house. ;
  • Monitoring daily production of straw section, managing the shifts, achieving production and quality targets. ;
  • Smooth operation of the machines by following the routine maintenance procedures of electrical components of the machines, ensuring continuous supply of power to the machines and maintaining the inventory of the necessary electric components. ;
  • Troubleshooting faults in the electric components (sensors, relays, electric control units, electric wiring) of the machines and their rectification in least possible time duration to avoid production loss. ;
  • Following the required safety and hygiene standards as well as maintaining 5S within the premises of the production floor. ;
  • Visits of customer's factories to inquire about any issues being faced by them related to quality and the rectification of these problems by making adjustments in the production process. ;

Education and Qualifications

Year Qualifications Level Institution
2011 Bachelor of Science - Electrical Engineering Other University of Engineering & Technology No
2007 Other College of Science Samanabad FSD. No
2005 - Matriculation-Science Other High school No

Achievements and Awards

 Got the award of best Assistant Director for the year 2012-13  Successfully completed “Strategic Time Management Workshop”  Successfully completed “Solar Energy Training”  Got Dean’s Honor Role in 1st, 2nd, 3rd, 7th and in 8th semester  Studied throughout on scholarship  Delivered a lecture to junior session on “Final Year Project”

IT Skills

Software Skills

  • Word (Advanced)
  • Excel (Advanced)
  • Power Point (Advanced)
  • MATLAB (Intermediate)